Around 41 ha of land is under public and semi-public use of land in ABD area. The table below highlights the area under various subcategories of public and semi-public use of land. Although area requirement under various social facilities have been calculated, the area under consideration is too congested and there is almost no land available for new development. In such a situation of brown field development, where we have to retrofit the requirement of infrastructure, we have to go for change in development control regulations to fit the area requirement. We may also go for multi-use of same space for different activities.

Educational Facilities

Around 21.8 ha of land is under educational facilities in ABD area, which comes out to be 55.26% of area under public and semi-public use. As per the standards of Indore Development Plan 2021, there is a gap of 54 pre-primary and primary schools in ABD area. The issue being serious needs to be considered on priority basis.

Table: Existing Requirement of Educational Facilities in ABD Area
Educational Facilities Standard Pop./unit Required Existing GAP
Pre-Primary/Play/ Nursery School 1 for 2500-3000 Population 3000 40 4 36
Primary School 1 for 3000-4000 Population 4000 30 12 18
Higher Secondary School 1 for 7500-10000 Population 10000 12 14 -2
School for Physically Challenged 1 for 45000 Population 45000 3 1 2
College 1 for 0.8-1 lakh Population 100000 1 1 0

Healthcare Facilities

Around 3.2 ha of land is under healthcare facilities in ABD area, which comes out to be 7.74% of area under public and semi-public use. It is to be noted that the facilities highlighted in bold (physiotherapy centre, blood bank, pathology, pet clinic, nursing home and naturopathy centre) belongs to private sector business and hence land/space need not to be reserved for such facilities. The condition of this sector is acceptable based on future demand expect requirement of polyclinics.

Table: Existing Requirement of Healthcare Facilities in ABD Area
Healthcare Facilities Standard Pop./unit Required Existing GAP
Physiotherapy Centre* 1 for 0.25 Lakh Population 25000 5 5
Blood Bank/ Pathology Centre* 1 for 0.25 Lakh Population 25000 5 5
Pet Clinic* 1 for 0.25 Lakh Population 25000 5 5
Health Centre 1 for 0.5 lakh Population 50000 2 4 -2
Nursing Home* 1 for 0.5 lakh Population 50000 2 4 -2
Polyclinic 1 for 0.5 lakh Population 50000 2 2
Hospital (0-30 beds) 1 for 0.5 lakh Population 50000 2 2 0
Hospital (30-100 beds) 1 for 1 lakh Population 100000 1 6 -5
Hospital (100 + Beds) 1 for 1 lakh Population 100000 1 2 -1
Naturopathy Centre* 1 for 1 lakh Population 100000 1 1
*Private sector facilities

Socio-cultural Facilities

There is a remarkable gap in provision of socio-cultural facilities as shown in the table below. This sector needs attention, while planning for retrofitting/ redevelopment of ABD.

Table: Existing Requirement of Socio-cultural Facilities in ABD Area
Socio-Cultural Facilities Standard Pop./unit Required Existing GAP
Religious Building* 1 for 5000 Population 5000 24 77 -53
Community Centre & Library 1 for 10000 Population 10000 12 1 11
Conference Hall 1 for 0.5 lakh Population 50000 2 2
Club 1 for 0.5 lakh Population 50000 2 2
Religious/ spiritual centre* 1 for 1-3 lakh population 150000 1 1
*Private sector facilities

Public Safety

The condition of public safety facilities are acceptable in the study area.

Table: Existing Requirement of Facilities for Public Safety in ABD Area
Public Safety Standard Pop./unit Required Existing GAP
Police Chowki 1 for 40000-50000 population 50000 2 1 1
Police Station 1 for 0.75-0.90 population 90000 1 2 -1

Other Facilities

There is a remarkable gap of LPG godowns and taxi and bus stands as per the standards of Indore Development Plan 2021.

Table: Existing Requirement of Other Facilities in ABD Area
Other Facilities Standard Pop./unit Required Existing GAP
Milk Distribution Centre* 1 for 5000 population 5000 24 4 20
LPG Godown 1 for 4000-5000 population 5000 24 24
Taxi and Auto Stand 1 for 15000 population 15000 8 3 5
Cremation Ground/ Burial Ground 1 for 1.5 – 2 lakh population 200000 1 2 -1
Electric substation (66 kW) 1 for 1 lakh population 100000 1 1 0
Electric substation (11kW) 1 for 7500-10000 population 10000 12 1 11
*Private sector facilities